ADCP Deployments for the NR1 and Mekong River Bridge Project

In support of the NR1 and Mekong River Bridge project, JEB conducted a phased ADCP survey. The first survey took place during the rain seasons to capture data when water levels and flows were high. The second survey took place at the beginning of the dry season.

Each survey consisted of 11 transects that were each surveyed four (4) times to average the results and provide reliable values. We used our Teledyne Workhorse II Sentinel 1200kHz ADCP equipped with Bottom Tracking to conduct the surveys.