Sihanouk International Airport: Soil Investigation for Runway Preparation

To prepare for the 800-meter extension of the Sihanoukville International Airport runway in 2018, JEB carried out geotechnical investigations. The investigations, performed in the southwestern area of the site, covered 1500 meters of ground soil with over 75 tested locations (by CPTu or borehole drilling and sampling).