Minibea III: Drainage Concept Design

2015, the Consultant models the drainage for the 4.4ha MINIBEA Factory (Phase III) on behalf of the Contractor SATO-KOGYO. The result were later implemented into the concept design phase to be included in the factory design by the Contractor.