Prek Dambang Riverbank: Design And Repair

A private property along the Mekong River in Prek Dambang was losing approximately 50 meters of land due to natural erosion. Jeb managed the entire project scope (surveys, analysis, design, and construction) to rehabilitate the riverbank through the use of geotextiles and earthworks such as toe protection, slope filling and protection, and galvanized gabions (14,122 m3 of stone, 6,403 m3 of geotextile, and 1,120 m3 of gabion). These protective measures minimized land losses and increased the owner’s property value.